Lesotho (8 locations):
Rural Airfield Development

Disciplines

  • Masterplanning
  • Airports

Companies

Dorsch International Consultants

Client

Department of Civil Aviation

Duration

From 1982 to 1983

Project Activities

  • Preliminary design
  • Detailed design
  • Preparation of tender documents
  • Assistance in tendering and contractor prequalification
  • Evaluation of tenders
  • Construction supervision

Contact

Dorsch International Consultants GmbH

München (Headquarters)
Landsberger Str. 368
80687 München
Germany

Phone: +49 89 5797-0
Fax: +49 89 5797-800
E-Mail: info@dorsch.de

View in maps

Description

Three major airfields (Qacha's Nek, Semonkong, Seshote) had to be improved to the standard of utility airfields in accordance with FAA requirements regarding runway, taxiway, apron, terminal building, tower, equipment, power and water supply, sewage disposal, etc.

At five other airfields the pavement, drainage and safety conditions had to be improved.