Abu Dhabi:
Sewerage Networks

Disziplinen

  • Siedlungswasserwirtschaft
  • Wasserbau

Gesellschaften

DC Abu Dhabi

Auftraggeber

Sewerage Projects Committee

Dauer

Von 1987 bis 1992

Projektleistungen

  • Preliminary design
  • Detailed design
  • Tendering
  • Construction supervision.

Kontakt

Abu Dhabi (Headquaters)
Salam Street
Lulu Centre, 5th, 10th and 15th Floor
P.O. Box 26417

Abu Dhabi
United Arab Emirates

Tel.: +971 2 6721923
Fax: +971 2 6720809
E-Mail: info@dorsch.com

Karte

Beschreibung

The project area, located some 50 km south-east of the capital, is split into the 4 main sections of Al Nahda Military Village, Bani Yas, Al Wathba North and Al Wathba South with a total of 560.8 hectares and approx. 20 000 inhabitants. Each of the sections concerned is of a residential nature, though also including a number of public services such as school sand mosques.

The aim of the project is - on the basis of a daily net effluent of 250 l / inhabitant and all the relevant demographic, socio-economic and climatological criteria - to design appropriate sewerage schemes to connect these individual sections with the existing sewage treatment works at nearby Mafraq. As a result of the prevailing high temperature there was a high risk ofboth malodours (H2S) and pipe corrosion (H2S4).

Special attention was therefore paid to avoiding anaerobic conditions in the net and selecting corrosion resistant pipe material.