Rayong, Khao Bo Ya:Gas Plant Project, Thailand
Disciplines
- Oil & Gas
Companies
Dorsch Consult asia Co., Ltd.
Client
Petroleum Authority of Thailand (PTT)
Duration
From 1981 to 1985Project Activities
- Basic engineering/preliminary design
- Preparation of specifications and bid documents
- Bid evaluation
- Checking of contractor's detailed design
- Construction supervision
Contact
Dorsch Consult asia Co., Ltd.
Bangkok (Headquarters)
18th Floor
Rama 4 Road
Tungmahamek, Sathon
10120 Bangkok
Thailand
Phone: +66 2 - 679 89 00
Fax: +66 2 - 679 89 95
E-Mail: dcasia@dorsch.co.th
Description
The plant consists of the following main sections:
1. Gas Separation Plant at Rayong
- Separation facilities
- Utility generation of supply and distribution system
- Offsite facilities
- Buildings for all services
2. Transfer Pipelines
- LPG pipeline (64 km)
- Propane pipeline (64 km)
- Natural gas pipeline (64 km)
- Natural gasoline/crude oil & product pipelines from marine terminal to Torc refinery/Siracha tank farm
3. Marine Terminal
- Tank farm
- Offsite facilities
- Service buildings
4. Jetty
The jetty has a deep-water berth for propane, butane & LPG tankers of 30000 to 80000 m3 capacity & for crude oil, natural gasoline and petroleum tankers of up to 100 000 dwt with an access bridge of 1300 m in length and a twin berth for LPG/propane & natural gasoline barges of up to 2000 dwt and oil & natural gasoline tankers of up to 5000 dwt with a 275 m access bridge branching off the main access bridge.
5. Housing Areas
In the vicinity of the gas separation plant & the marine terminal two housing areas are provided for the accommodation & recreation of employees & their families. A housing area is designed to accommodate 175 families with a total of 700 persons & the other one to accommodate 75 families with a total of 300 persons.