Coburg / Upper Franconia (Bavaria):
Coburg - 10 level crossing facilities on lines 5121 and 6311

Disciplines

  • Railways

Companies

GRE German Rail Engineering GmbH

Client

ALSTOM Transport Deutschland GmbH

Duration

From 2021 to 2023

Project Activities

  • Technical planning of level crossings Lph 1-3

Contact

GRE German Rail Engineering GmbH

Frankfurt (Headquarters)
Frankfurt Airport Center 1
Hugo-Eckener-Ring

D-60549 Frankfurt am Main
Deutschland

Phone: +49 30 24749-0
Fax: +49 30 24749-204
E-Mail: info@gre-rail.com

View in maps

Description

Upgrading and equipping the Main Loop Railway
Planning for the 1:1 replacement of the old level crossing systems and the conversion/adaptation to a B950 electronic interlocking via the SCI-LX interface within the scope of the SLP-Coburg on the single-track, electrified regional railway lines with multi-track station areas: Line 5121 km 0.936 - 16.772 and Line 6311, km 138.140 - 148.375

  • Basic evaluation
  • Examination and implementation of the conversion capability 1:1 within the scope of the fast-track project for all 10 level crossings
  • Design planning
  • Preparation of the implementation planning for the signalling system (PT1) in several construction phases including GFR (IHI) at 5 level crossings
  • Preparation of the implementation planning for the 50 Hz system
  • Technical inspection of PT1 by subcontractor
  • Technical inspection of 50 Hz system by subcontractor